The Bathroom Installation Process, Step by Step
Hertfordshire, Bedfordshire & Cambridgeshire
A bathroom installation follows the same order in almost every home: survey and design, a fixed quote, strip out, first fix plumbing and electrics, walls and floor preparation including waterproofing, tiling, second fix of the suite and fittings, then testing, sealing and handover. Knowing that order helps you plan how long you will be without a bathroom, when decisions need making, and what to check before each stage is covered up.
In short
- Most of the important work is hidden: pipework, waste runs, waterproofing and cabling all go in before the tiles.
- Decisions on the suite, tiles and layout should be made before work starts, because changes mid-job cause delays.
- Showers and wet areas need proper waterproofing behind the tiles, not just tile and grout.
- Extractor fans must meet Building Regulations, and electrical work in the zones around a bath or shower is notifiable.
- A good installer gives you a written schedule, protects the rest of the house and leaves you with the paperwork.
- Our bathroom installations carry a 2 year guarantee.

Before any work starts
1. Survey and design
The installer visits, measures the room and looks at what cannot easily move: the soil pipe, the window, the door, the direction of the floor joists and where the water supply and boiler are. This is also when you talk through how the room is used. A family bathroom, an en suite and a room for someone with limited mobility need different things.
A good survey checks the parts you will not see later, such as the condition of the floor, whether the walls are solid or stud, your water pressure and hot water supply, and whether the ceiling can take an extractor duct to outside. Our bathroom installations page explains how we run this stage.
2. Choosing products
Choose the bath or shower, basin, toilet, taps, shower valve, tiles, lighting and furniture before the start date. Check that:
- The shower valve suits your hot water system and pressure.
- Wall-hung toilets and basins have a frame or a wall strong enough to take them.
- Tiles are suitable for floors if they are going on the floor, with enough slip resistance for a wet room.
- Everything is in stock or has a delivery date well before the start.
3. The quote
The quote should list every stage, what is included and what is not, and who supplies what. Our guide to what a bathroom installation quote should include gives you a checklist to compare quotes line by line.
The installation, stage by stage
4. Protection and strip out
Floors, stairs and landings are covered, and the water is isolated. Electrical circuits to the room are made safe. The old suite, tiles and sometimes plasterboard or floorboards are removed. This is when hidden problems show up, such as rotten joists under an old toilet or a leak that has been running into the floor. A good installer shows you, explains the options and agrees any extra work in writing before carrying on.
5. First fix plumbing and electrics
With the room stripped, new pipework and waste runs go in to suit the new layout. The shower valve is set in the wall at the right height, supplies are run for taps and toilet, and waste pipes are laid with the right fall. Cables are run for lighting, the extractor fan, any shaver point, heated towel rail or underfloor heating. Everything is pressure tested before it is covered.
Electrical work in the zones around a bath or shower is notifiable under Part P of the Building Regulations, so it must be done by a registered electrician who can certify it, or checked by building control. We cover this as part of the job, and our electrical installations page explains the certification you should receive.
6. Walls, floor and waterproofing
New boards go on walls and floors where needed. In the shower area, and across the whole floor in a wet room, a tanking system is applied to make the surface waterproof before tiling. Tiles and grout are not waterproof on their own, and a shower without tanking will eventually let water into the wall or floor. Floors may be levelled or strengthened so tiles do not crack.
7. Extractor fan
Building Regulations set a minimum extract rate for bathrooms of 15 litres per second for an intermittent fan. In a bathroom with no openable window, the fan must keep running for at least 15 minutes after the room is left. When an existing bathroom is refurbished, any existing fan should be kept or replaced. A fan that is too weak, or ducted a long way through the loft without insulation, is one of the most common causes of mould.
8. Tiling
Tiling usually takes longer than people expect, especially with large format tiles, patterns or niches. Walls are set out so cuts are even at both ends, and floor tiles are laid to fall towards the waste in a walk-in shower or wet room. See our bathroom tiling page for more on how we set out and finish tiles.
9. Second fix
The bath, shower tray, toilet, basin and furniture are fitted and connected, taps and shower controls are fitted, the screen or enclosure goes up, and the lights, fan and towel rail are connected.
10. Sealing, testing and finishing
Every joint where a fitting meets a wall is sealed with a bathroom silicone. Taps, the shower, the toilet and all wastes are run and checked for leaks, and the extractor fan and lighting are tested. Decorating follows once the silicone and any new plaster have cured.
11. Handover
You should be shown how the shower valve and any controls work, where the isolation valves are, and how to clean the finishes. Keep the product guarantees, the electrical certificate and any building control paperwork together.
A typical order of work at a glance
| Stage | What happens | What to check |
|---|---|---|
| Survey and design | Measure, check pipework and structure, agree layout | Layout works with the door, soil pipe and window |
| Strip out | Old suite and finishes removed | Any hidden damage is explained and agreed in writing |
| First fix | New pipework, wastes and cables | Shower valve height and position, before walls close |
| Waterproofing | Boards and tanking in wet areas | Tanking covers the full shower area |
| Tiling | Walls and floor tiled, grouted | Even cuts, straight lines, correct floor fall |
| Second fix | Suite, taps, screen, lights and fan fitted | Everything level, secure and working |
| Handover | Testing, sealing, paperwork | Certificates and guarantees in your hands |
How to prepare your home
- Plan for the time without a bathroom. If this is your only bathroom, ask how long the toilet will be out of action and whether a temporary one can be kept working overnight.
- Clear the room and route. Empty cabinets and clear the landing and stairs so materials can come in safely.
- Arrange parking and deliveries so the suite and tiles can be stored somewhere dry and secure.
- Agree how changes are handled. Any change to the plan should be agreed in writing with any extra cost before it is done.
- Keep an eye on the hidden stages. Ask to see the pipework and tanking before they are covered. A good installer will be happy to show you.
Mistakes that slow a job down
- Ordering tiles or a suite that arrives late or damaged.
- Changing the layout after first fix, which means reworking pipes and cables.
- Choosing a shower that does not suit the hot water system.
- Skipping tanking to save time.
- Fitting a fan that cannot move enough air through a long duct.
Our guide to common bathroom renovation mistakes goes into these in more detail.
How we price it
Installations are quoted as a fixed price after a free survey, so the price you agree is the price you pay. The quote sets out every stage, and if hidden damage is found during strip out we explain it and agree any extra work with you before doing it. Our other rates, for repairs and smaller jobs, are published on our prices page. Every bathroom we install comes with a 2 year guarantee.
Frequently asked questions
How long does a bathroom installation take?
It depends on the size of the room, whether the layout changes, how much tiling there is and whether it is a wet room. Your installer should give you a written schedule at quote stage, and a layout change or wet room will take longer than a like-for-like replacement.
Can I use my bathroom during the installation?
Not for most of the job. The toilet can sometimes be refitted temporarily at the end of a working day, so ask about this at the quote stage if it is your only bathroom.
Does a new bathroom need Building Regulations approval?
A like-for-like replacement often does not need a full application, but electrical work in the zones around a bath or shower is notifiable, and new drainage and ventilation must meet the regulations. Your installer should handle the notifications and give you the certificates.
What is first fix and second fix in a bathroom?
First fix is the hidden work done before walls and floors are closed up: pipework, wastes and cables. Second fix is fitting and connecting the suite, taps, shower, lights and fan once the tiling is finished.
Should the same company do the plumbing, electrics and tiling?
It usually makes the job faster and easier, because one company plans the order of work and is responsible for the finished result. If trades are separate, agree clearly who is responsible for the waterproofing and final sign-off.
Bathroom installation in Hertfordshire, Bedfordshire and Cambridgeshire
We plan and install bathrooms from survey to handover, with our own engineers. Visit our bathroom installations page or call 01462 506374 to arrange a free survey.
What our customers say
Speak to a local engineer
Vantage Plumbing and Heating covers Hertfordshire, Bedfordshire and the surrounding areas. Call and talk to an engineer, or send us the details and we will come back to you with a price.
Gas Safe registered, number 956889. Emergency line answered 24/7.
Bathroom fitters near you
Planning a new bathroom? Our own team designs and fits it
We cover Hertfordshire, Bedfordshire and Cambridgeshire. Choose your town:
Not listed? See all the areas we cover or call 01462 506 374