your new bathroom, designed, supplied and fitted, free design consultation included
Applies to full bathroom renovations designed, supplied and fitted by Vantage Plumbing and Heating. The discount comes off the quoted price and is shown as a line on your written quote. Fixed price agreed before we start. Cannot be combined with any other offer.
Almost nothing in this town existed before 1998. Construction started on the old farmland in June 1998 and the first house was occupied in August 1999, which means the earliest bathrooms in Great Cambourne and Lower Cambourne are now twenty five years old and well past the point where the original shower valve, tray and grout were ever expected to last. That is most of what we get called to here: not a Victorian conversion problem, but a good house with a tired room in it.
Vantage Plumbing and Heating is Gas Safe registered under 956889 and works out of Stevenage, roughly twenty two miles south south west of CB23. Full strip outs and refits, wet rooms, walk-in showers, en suites and cloakrooms, tiling and tanking done by us, and 12 months on our workmanship.
Vantage Plumbing and Heating covers Cambourne from our base in Stevenage. We are Gas Safe registered under 956889, we carry the common parts on the van, and we guarantee our labour for 12 months.
Cambridge Water supplies the town, and the parish sits in the Coton water quality zone, Z6, which also takes in Bourn, Caxton, Elsworth, Papworth Everard, Papworth St Agnes, Hardwick, Comberton and Toft. Cambridge Water’s published water quality report for that zone gives total hardness of 317.8 mg/l of calcium carbonate, which is 22.2 Clark degrees, with average calcium of 120.4 mg/l. That is the water company’s published zone figure, not a reading we took at your stopcock.
Anything above 300 mg/l is the point at which the industry stops saying hard and starts saying very hard. Cambridge Water puts it simply on its own pages: all of the water it supplies is hard.
In a Cambourne bathroom that shows up in three specific places, and they are the three places we spend money to protect.
Shower glass is the one you look at every day. Untreated glass in this water goes cloudy within a season if nobody squeegees it, so where the budget allows we use coated glass, and either way we tell you what the maintenance actually is.
Brassware is the one that creeps up on you. Aerators block with scale until a clean column of water starts spitting sideways.
Thermostatic cartridges are the one that costs money. Scale forms inside the valve, and the classic symptom is a shower that held temperature for years suddenly going cold when the kitchen tap runs. We specify bar and concealed valves whose cartridges you can buy and replace, rather than sealed units that mean lifting tiles to change, and we build access panels into the design where the layout allows.
There is also the point most people miss. If you have a combi, the same water is scaling the plate heat exchanger inside it, and hot water that runs warm then cold is often the boiler rather than the shower. A refit is the sensible moment to deal with scale reduction properly, because the water is already off and the pipework is already open.
This is one of the few places we work where the pressure conversation is normally straightforward. Cambourne is modern housing on modern mains, so most properties deliver enough for a proper mains fed shower off a combi or an unvented cylinder, rather than the gravity fed compromises we meet in older stock elsewhere in the region.
We still measure. On the survey we gauge static pressure and time the flow into a measured container, then design to the number we get. The reason is simple: a rainfall head plus body jets plus a second shower running on a school morning needs litres per minute, and the only way to know whether your house can supply that is to check. In the larger four and five bedroom plots with an en suite and a family bathroom in use at once, a correctly sized unvented cylinder is usually the right answer.
Unvented cylinders where more than one outlet needs to perform at the same time.
Thermostatic valves with cartridges you can actually buy, given what the water does to them.
Wet room formers and full tanking systems, never waterproofing a deck by eye. Tanking is what you are really buying in a wet room.
Low profile trays with proper waste access, which matters where a deck leaves little depth above the ceiling below.
Extraction ducted properly to outside, terminated correctly rather than dumped into a loft void. A well sealed modern house with weak bathroom extraction puts mould on new grout inside a year.
Moisture resistant boarding and decoupling where tiles go onto a timber deck, because a chipboard floor that flexes will crack grout and eventually a tile.
Refitting a bathroom in a house built since 1999 is not easier than a period job, it is different, and the differences catch out fitters who mostly work on older stock.
The floor is usually a chipboard deck rather than boards, so it comes up in sheets and it does not go back the same way. Get the deck wrong and the tiled floor tells everyone about it within two winters.
The pipework is very often plastic barrier pipe rather than copper, frequently run from a manifold, and pushfit rather than soldered. That changes how you trace a run, how you isolate, and what a neat alteration looks like. We work with it rather than ripping it all out for the sake of it.
Joists in modern floors are not all solid timber, and where they are engineered you cannot simply notch them to suit a new waste. We work out the route at survey and design the layout around what the structure allows, which is one reason we ask to see under the floor before we quote rather than after.
Stud walls and service voids are where the waste and the concealed valves live, and the temptation is to bury everything and forget about it. We put access where a future engineer will need it and tell you where it is.
Great Cambourne and Lower Cambourne, from 1999 to the mid 2000s. The original phase, built out under the first 3,300 home permission by Bovis Homes, Bryant Homes and Taylor Wimpey. Around Jeavons Lane, Greenhaze Lane and Monkfield Lane this is the stock where a full strip out is genuinely due: original tray, original valve, grout that has been resealed twice, and limescale damage to everything the water touches. Layouts are usually workable, and because the drainage is modern the constraint is normally getting a decent fall from a bedroom corner to the stack, not structural.
Upper Cambourne, roughly 2008 to 2018. Newer, so the work is more often an upgrade than a rescue: converting a bath and shower over it into a proper walk-in, or turning a tired en suite into a shower room that two people can actually use. This is also where the parish’s one listed building, Great Common Farmhouse, stands, which is Grade II. It is worth saying plainly that a town with a single listed building and no conservation area means bathroom work here is almost never constrained by heritage consent. What does apply is estate management rules and covenants, so if a job involves anything external we check those instead.
Cambourne West, from the 2017 outline permission. Sheepfold, Swansley Park and Woodfield are still building out towards roughly 2,350 homes between them. The work we see on brand new stock is not refits, it is upgrades that the developer specification did not stretch to: better valves, proper glass, a rethought en suite, and tiling that is actually finished the way you wanted.
Lamb Drove. Thirty five affordable homes on a one hectare site, occupied from spring 2006, and nationally known as a sustainable drainage demonstration scheme with water butts, permeable paving, swales, filter strips, detention basins and a retention pond. It is a useful reminder of something that applies across the whole town: the ground here is clay with poor infiltration, and surface water is managed by the SuDS landscape rather than by soaking away. That matters if a bathroom job involves anything at ground level or outside, and it is a reason not to be casual about where a new waste discharges.
We do not print a single number, because a downstairs cloakroom and a full wet room conversion in a five bedroom house are not the same job.
Where the money goes is simple enough. Labour and tiling are the biggest element of most bathrooms, and they follow the size and complexity of the room rather than the price of the suite. Moving a toilet, forming a wet room, replacing a floor deck or upgrading to an unvented cylinder each add a step. Keeping the existing layout is much the cheapest route, and where that suits you we will say so rather than talk you upwards.
The quote is itemised so every decision has a cost against it, and the total is fixed before we begin. Where something genuinely cannot be seen until the deck comes up, such as the state of the floor around an old tray, we give you the range at quote stage. For everyday work see general plumbing in Cambourne, and for water going somewhere it should not, leak detection in Cambourne.
Gas Safe registered, registration 956889. Engineers working out of Stevenage across Hertfordshire, Bedfordshire and Cambridgeshire. One team does the lot, one person to call, and an itemised price settled before we lift a board. A 12 month guarantee on our workmanship. Emergency cover 24 hours a day, all year round, and it is genuine. Company no. 13248357, VAT no. 392 8946 37.
Great Cambourne, Lower Cambourne, Upper Cambourne and Cambourne West, plus Bourn, Caxton, Elsworth, Knapwell, Boxworth, Papworth Everard, Papworth St Agnes, Hardwick, Highfields Caldecote, Comberton, Toft, Bar Hill and Haslingfield. We also cover Cambridge to the east and St Neots and Huntingdon to the west and north. If your village does not appear here, give us a ring.
Nearby: Bathroom renovation in St Neots · Bathroom renovation in Cambridge · Bathroom renovation in Godmanchester
With a 4.9 rating on Google and more than 700 reviews across Google, Checkatrade and Trustatrader, fully qualified and accredited engineers, transparent pricing, and a 2-year labour guarantee on every job, Vantage delivers reliable, high-quality workmanship you can trust with fast response times, and genuine local service.
Two to three weeks on site for a full strip out and refit. An en suite or cloakroom is quicker. If somebody offers you a complete refit in five days, ask whether the tiling or the drying time is what has been removed.
Yes. Cambridge Water’s published figure for the Coton zone, which covers the parish, is 317.8 mg/l of calcium carbonate, which is above the 300 mg/l line where very hard begins. It is the main reason shower valves, glass and brassware fail early here.
Often, yes. The first Cambourne bathrooms are now at the age where the tray, the valve, the sealant and the tiling behind it are all at end of life together. Patching one item on a twenty five year old room usually just moves the problem along.
An internal refit is a building regulations matter rather than a planning one, and the parish has one listed building and no conservation area, so heritage consent is rarely in play. Estate covenants and management rules can apply to anything external, and we check those.
Yes. Plastic barrier pipe run from manifolds is normal in this stock, and we alter and extend it properly rather than hacking a copper system into it. We will tell you where a section is better replaced than adapted.
Plumbing, tiling, tanking, extraction and the making good all sit with us under a single price. Electrical work is carried out by qualified electricians and certificated as part of the job.
Call 01462 506374 or use the fixed-price quote form. We will measure the flow, look under the floor and put an itemised fixed price in writing.
24/7 Emergency? Contact Us Now