your new bathroom, designed, supplied and fitted, free design consultation included
Applies to full bathroom renovations designed, supplied and fitted by Vantage Plumbing and Heating. The discount comes off the quoted price and is shown as a line on your written quote. Fixed price agreed before we start. Cannot be combined with any other offer.
We measure, we test the pressure, we look under the floor, and then we give you a written price with the specification attached to it. The person who quotes your bathroom is the person who plans the job, so nothing gets agreed on the doorstep and forgotten by the time the tiles arrive.
Vantage Plumbing and Heating is Gas Safe registered under 956889, based in Stevenage, and out in MK45 regularly. Full bathrooms, en suites, wet rooms, cloakrooms and shower room conversions, with a 12 month guarantee on our workmanship.
Start with what comes out of the wall, because it dictates what will actually work in the room.
Flitwick sits in the MK45 supply zone. Anglian Water is the confirmed supplier for neighbouring Ampthill in the same zone, so it is very likely the company behind your tap here too, though your bill is the definitive answer. The figure published for the MK45 district is roughly 264 mg/l as calcium carbonate, classed hard. That comes from a third party postcode lookup rather than a supplier zone report for Flitwick itself, so treat it as a district indication.
Hard water is a maintenance issue rather than a crisis. Shower screens will film over if they are not squeegeed, brassware will spot, and a thermostatic shower cartridge will scale up eventually.
What we do about it at specification stage is practical. Where a client wants a frameless glass screen, we push for a factory applied protective coating, because that decision is the difference between wiping the glass and scrubbing it. Where a client wants a concealed shower valve buried in a tiled wall, we insist on one with serviceable cartridges accessible from the front, because the alternative in a hard water area is chopping tiles off a finished wall in year seven. And if there is a real appetite for softened water, that is a conversation about a proper unit on the main, planned into the job, not an afterthought.
The other half of the story is pressure and flow, and we could find no reliable town wide figure for Flitwick. That is not a problem, it just means we test rather than assume. We put a gauge on the outside tap or the kitchen cold and measure both static pressure and flow rate before we specify anything. A rainfall head that needs a strong flow and a house that cannot deliver it is the single most common cause of disappointment in a finished bathroom.
Most jobs here fall into one of three shapes.
A straight replacement bathroom. Same layout, better everything. Bath with a shower over, or a bath taken out and a walk in enclosure put in its place. This is the bulk of what we do in the estate housing and it is the least disruptive option because the drainage stays where it is.
An en suite added to a main bedroom. Popular in the four bedroom family houses, and the whole job hinges on where the waste can go. More on that below.
A wet room or a level access shower. Sometimes a design choice, often a practical one for somebody who wants to stay in the house they have. This means tanking the floor and walls properly, forming a fall in the substrate and choosing a drain that can actually be cleared without lifting tiles.
On the hot water side, where a house has a system boiler and an unvented cylinder already, a good bathroom is straightforward because the pressure is there. Where a house is on a combi, the flow rate at the boiler sets the ceiling on what the shower can do, and no amount of expensive brassware changes that. Where a house still has a cold tank in the loft and a vented cylinder, you are on gravity pressure, and either a pump or a move to an unvented cylinder is the honest answer rather than pretending a low pressure shower will feel good.
Flitwick expanded outward from a small old centre in waves, and the bathrooms tell you which wave a house belongs to before anybody checks the deeds.
The Hawthorns, Bluebell Close and Buttermere Close. Estate cul de sacs, and the naming style points to later twentieth century development as the town grew around the station, though nobody has a confirmed build date for each close and we do not pretend otherwise. The bathrooms are usually small, square and sitting over a hallway or a kitchen. The constraint is almost never the room, it is the floor. Joist depth and joist direction decide where a new waste can go, and both get measured at survey rather than assumed. Dropping a shower tray flush with the finished floor means either a low profile tray with a shallow trap, or a build up that raises the whole floor and then has to be married into the doorway and the landing. Finding that out with the old suite already in a skip is how bathrooms overrun.
Church Road, Brook Lane, Hockliffe Road and Fry Grove. Named residential roads with no recorded build era between them, which is exactly why the survey matters more than the postcode. We lift a board, look at the floor void and the existing waste route, and plan from what is in front of us.
Maulden Road. A long established residential road with a genuinely mixed run of ages along it, which is a fair description of the survey too. Older properties on this sort of road often still have the original soil stack on an outside wall and a bathroom that was converted out of a third bedroom decades ago. Reusing a stack in that position is usually possible, but the fall on the horizontal run is the thing to check, and a slow, badly graded shower waste is the reason so many people think their new tray leaks when it is actually just draining badly.
The Avenue. Reported as early ribbon development from around 1900 to 1905, so Edwardian and older than the commuter era estates. Deep floor voids, timber that has moved over a century, and walls that are rarely square. Tiling a room like that well means battening or boarding to get a true plane first, and anybody who quotes to tile straight onto original plaster is quoting for a job that will crack.
Steppingley Road. New build territory now, with Saxon Woods going up and the senior living village on the former leisure centre site, which is targeting Passivhaus certification. Modern floors of this type are often engineered joists, and you cannot cut a notch wherever you like in an engineered joist: I-joists and metal web joists only take services where the manufacturer’s schedule allows, so a moved waste is a design decision before it is a saw decision. Bathrooms in airtight houses also live or die on ventilation. Put a shower in a room with a token extractor and you get condensation and mould regardless of how good the tiling is. We specify extraction to suit the room and the build, and in a very airtight house that is a more serious calculation than it sounds.
Adding an en suite or a downstairs cloakroom is a drainage question first and a design question second. The three options are gravity to an existing stack, a new connection to the drain, or a macerator pump. We will use a macerator where it genuinely is the only sensible route, and we will tell you where it is a compromise rather than selling it as a feature.
Where a new external connection is needed, Flitwick’s ground helps. Most of the town sits on the Woburn Sands Formation, a sand and sandstone unit that is free draining by nature. That is generally kind for excavation and for anything soakaway related. Two caveats we apply on site. The northern fringe of the town touches clay formations, which behave nothing like sand, and the low ground down towards the River Flit and Flitwick Moor is wet, peaty and slow draining. If your property is on that side of town, near Greenfield Road and the Moor, we treat any external drainage work with the water table in mind rather than assuming free draining sand.
A bathroom is not a product, so there is no meaningful price to put on a page. What we will give you is a written, itemised price after a survey, with the labour, the materials and the tiling area all specified, so you can compare it properly against anybody else.
As a rough guide to time, a full strip out and refit of a standard family bathroom is typically two to three weeks on site. That covers strip out, first fix pipework and any waste re routing, electrical first fix, boarding and tanking, tiling, second fix, sealing and snagging. Wet rooms and rooms needing structural work to the floor take longer. Anyone promising you a finished bathroom in five days is either using a very small room as their example or is planning to skip the drying times that tiling and tanking actually need.
The variables that move a Flitwick quote most are the tiling area, whether the drainage is moving, whether the floor needs building up or strengthening, and whether hot water provision has to change to make the shower perform.
Because we are a heating firm as well as a bathroom firm, the awkward crossovers are covered by one team. Moving a boiler out of a bathroom or airing cupboard to free up space, swapping a vented cylinder for an unvented one so the shower actually works, fitting a heated towel rail onto the heating circuit properly rather than hanging it off a spur, and moving radiators to suit the new layout. It also means the Gas Safe side of the job is not subcontracted to somebody you have never met.
Flitwick and MK45 generally, plus Ampthill, Maulden, Flitton, Greenfield, Steppingley, Pulloxhill, Clophill, Westoning, Harlington, Barton le Clay, Tingrith, Eversholt and Millbrook. Ask if your village is not on the list.
Nearby: Bathroom renovation in Ampthill · Bathroom renovation in Shefford · Bathroom renovation in Henlow
Not every bathroom job is a full refit. For repairs and everyday work, see everyday plumbing in Flitwick.
With a 4.9 rating on Google and more than 700 reviews across Google, Checkatrade and Trustatrader, fully qualified and accredited engineers, transparent pricing, and a 2-year labour guarantee on every job, Vantage delivers reliable, high-quality workmanship you can trust with fast response times, and genuine local service.
Typically two to three weeks for a full strip out and refit. Longer if the floor needs building up, if drainage is moving, or if it is a tanked wet room.
It is a maintenance job rather than a disaster. The MK45 district figure is around 264 mg/l, classed hard. Coated glass and a serviceable shower valve deal with most of it.
Only if your pressure and flow support it, which is why we test before specifying. On a combi the boiler flow rate is the limit. On a gravity system you will need a pump or an unvented cylinder.
Usually yes. The deciding factor is the waste route and the joist direction. We survey the floor void before committing to a position rather than working it out on the day.
Yes. Tanking, tiling and sealing are ours, with one point of contact and one guarantee. Electrical work is carried out by qualified electricians and certificated as part of the job.
Ventilation. Very airtight modern construction needs extraction sized properly for a shower room, otherwise moisture has nowhere to go and you get condensation problems in a brand new bathroom.
Call 01462 506374, or use the fixed-price quote form, and tell us what you are trying to achieve with the room. You get a written specification with the price.
24/7 Emergency? Contact Us Now