EICR for Landlords: Rules, Deadlines and Renewals
Hertfordshire, Bedfordshire & Cambridgeshire
Landlords in England must have the electrical installation in every rented home inspected and tested by a qualified person at least every five years, or sooner if the last report says so, and give a copy of the report (the EICR) to tenants and, on request, to the council. If the report finds anything dangerous or needing investigation, the work must be done within 28 days or any shorter time the report sets, and you must send written confirmation that it has been done.
- The rules apply to most private tenancies in England, and now to social housing too.
- Inspect at least every five years, or at the shorter interval the report recommends.
- Give existing tenants the report within 28 days, new tenants before they move in, and the council within 7 days of a written request.
- C1, C2 and FI items must be dealt with within 28 days, or sooner if the report says so.
- Councils can impose financial penalties for breaches, and the maximum was raised for offences from 1 May 2026.
Which lettings the rules cover
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply where a tenant has the right to live in the property as their only or main home and pays rent. That includes most assured shorthold tenancies, licences to occupy and houses in multiple occupation (HMOs). The rules applied to new private tenancies from 1 July 2020 and to all existing private tenancies from 1 April 2021.
Government guidance says some types of accommodation are excluded, including:
- lodgers who share accommodation with the landlord or the landlord’s family
- long leases of seven years or more
- student halls of residence, hostels and refuges
- care homes, hospitals and hospices
- mobile homes, caravans and boats
Social landlords are now covered too. For social housing tenancies granted after 1 December 2025 the rules already apply, and for tenancies granted before that date they came into force on 1 May 2026, with inspections due before 1 November 2026. Social landlords must also have the electrical equipment they provide checked at least every five years, which private landlords do not have to do under these rules.
Wales and Scotland have their own rules for rented homes, so check the requirements for where your property is.
Your duties and deadlines at a glance
| Duty | Deadline |
|---|---|
| Have the installation inspected and tested | At least every five years, or at the shorter interval the latest report sets |
| Give a copy to existing tenants | Within 28 days of the inspection |
| Give a copy to a new tenant | Before they move in |
| Give a copy to a prospective tenant | Within 28 days of their request |
| Give a copy to the local council | Within 7 days of a written request |
| Carry out remedial work or further investigation | Within 28 days, or the shorter period in the report |
| Send written confirmation of the work to tenants and the council | Within 28 days of the work being completed |
| Keep a copy of the report | Until the next inspection, and give it to the next inspector |
Our EICR service produces the report, explains every item on it and carries out any remedial work needed.
What the report codes mean for you
Every defect on an EICR is given a code. For landlords, the code decides whether you have to act.
| Code | Meaning | Do you have to act? |
|---|---|---|
| C1 | Danger present | Yes. The electrician will usually make it safe on the spot, and the repair must follow within 28 days at most |
| C2 | Potentially dangerous | Yes, within 28 days or sooner if the report says so |
| FI | Further investigation required | Yes, the investigation must be done within 28 days or sooner |
| C3 | Improvement recommended | No, it is not a failure, but worth planning in |
Any C1, C2 or FI makes the report unsatisfactory. Common findings in rented homes include old consumer units without RCD protection, missing earthing or bonding, damaged sockets and switches, and circuits that cannot be traced.
When the report is unsatisfactory
- Read the report with the electrician and agree what needs doing.
- Book the remedial work or further investigation straight away, so it is finished inside 28 days or the shorter period the report gives.
- Get written confirmation from the qualified person who did the work. The guidance says this can be a satisfactory EICR, an Electrical Installation Certificate, a Minor Electrical Installation Works Certificate or other appropriate certification.
- Send that confirmation, with the original report, to the tenant and to the council within 28 days of the work being completed.
- File everything with the property records.
If a landlord does not do the work, the council can serve a remedial notice, and if that is ignored it can arrange the work itself and recover the cost. In urgent cases, the council can arrange the work with the tenant’s consent after giving at least 48 hours’ notice.
Keeping tenants safe while work is arranged
- Do not let anyone use a circuit or fitting that the electrician has isolated because of a C1.
- Tell tenants to stop using any socket or switch that is scorched, cracked, buzzing or hot.
- Electrical repairs in a rented home must be done and certified by a qualified electrician. Much of the work is notifiable under Part P.
Renewals: staying ahead of the five-year date
The five-year period runs from the date of the last inspection, not the start of a tenancy. A few practical points:
- Check the recommended date. The report gives a date for the next inspection. If it is shorter than five years, that is your deadline.
- Book early. Arrange the renewal a couple of months before the due date, so there is time to finish any remedial work before the old report expires.
- New tenants do not need a new EICR if the current report is less than five years old and does not call for any remedial or investigative work. Just give them a copy before they move in.
- Keep the old report to hand for the electrician doing the next inspection, as the regulations require.
- Consider timing inspections between tenancies, when access is easier and any work causes less disruption.
- HMO licences may carry their own electrical conditions, so check your licence as well.
Qualified person: who can do the inspection
The regulations say the inspection must be done by a qualified person, meaning someone competent to carry out the inspection and testing of an electrical installation. Government guidance points landlords towards electricians on a competent person scheme register as a way to check competence. Our guide to choosing an electrician in Hertfordshire covers the questions to ask.
Penalties for getting it wrong
Local councils enforce the regulations. If a council is satisfied a landlord has breached the duties, it can impose a financial penalty running to tens of thousands of pounds. For offences committed from 1 May 2026, penalties fall under the Renters’ Rights Act 2025 and other housing legislation, and the maximum is higher than it was. Councils can also carry out remedial work themselves and recover the cost from the landlord.
Fitting EICRs into your wider compliance
An EICR is one part of keeping a rented home safe and legal. The others that run on regular cycles are:
| Check | How often |
|---|---|
| Gas safety check | At intervals of not more than 12 months, with a copy to tenants within 28 days |
| EICR | At least every five years |
| Smoke and carbon monoxide alarms | Checked working on the first day of each new tenancy, and repaired or replaced when reported faulty |
Booking gas and electrical checks together saves arranging access twice. We can book our landlord gas safety certificate and EICR services together, and our landlord services page covers everything we do for landlords.
What it costs with Vantage
In normal working hours there is no call-out fee. Every rate is published on our prices page, so you know what you will pay before we arrive. Any remedial work found during the inspection is explained and quoted before we do it, and after the first hour, repair time is charged in half-hour steps. Evening, weekend and overnight visits are charged at the out-of-hours rates. Our electrical work carries a 12 month labour guarantee.
Frequently asked questions
Is an EICR a legal requirement for landlords?
Yes, for most private and social tenancies in England. The electrical installation must be inspected and tested by a qualified person at least every five years, or more often if the last report says so.
What happens if a landlord does not have an EICR?
The council can take enforcement action, including a financial penalty and a remedial notice. Without a valid report you are also in breach of your duty to give tenants a copy, which can cause problems at the end of a tenancy.
Do I need a new EICR for every new tenant?
No. If the existing report is less than five years old and does not require any remedial or investigative work, you can rely on it. Give the new tenant a copy before they move in.
Does a C3 on an EICR mean I have to do the work?
No. A C3 is an improvement recommendation and does not make the report unsatisfactory. It is still worth planning in, especially if it relates to something you are updating anyway.
Does the EICR cover the appliances I provide?
No. An EICR covers the fixed installation. Private landlords are not required to test appliances under these regulations, although they must be safe, and testing them is good practice. Social landlords must have the equipment they provide checked at least every five years.
Help for landlords in Hertfordshire, Bedfordshire and Cambridgeshire
We carry out EICRs, remedial work and gas safety checks for landlords, and we explain every finding in plain English. See our EICR service or call 01462 506374.
What our customers say
Speak to a local engineer
Vantage Plumbing and Heating covers Hertfordshire, Bedfordshire and the surrounding areas. Call and talk to an engineer, or send us the details and we will come back to you with a price.
Gas Safe registered, number 956889. Emergency line answered 24/7.