EV Charger Installation Requirements: What You Need at Home
Hertfordshire, Bedfordshire & Cambridgeshire
To install an EV charger at home in the UK you need off-street parking, an electricity supply with enough spare capacity, a dedicated circuit with the right protection and earthing, and a smart charger that meets the Smart Charge Points Regulations. The work must be done by a qualified electrician to BS 7671, notified under Building Regulations, and reported to your local electricity network operator.
- You need a private, off-street parking space such as a driveway or garage.
- Your supply must have enough capacity for a charger, which is checked by a load assessment.
- Every home charger sold in Great Britain must be a smart charger with default off-peak settings.
- The installer must notify the local electricity network operator, and sometimes get approval first.
- Most wall-mounted chargers at a house do not need planning permission, but listed buildings are an exception.
EV charger requirements checklist
| Requirement | What it means | Who deals with it |
|---|---|---|
| Off-street parking | A driveway, garage or private space the cable can reach without crossing a pavement | You |
| Supply capacity | Your main fuse and incoming supply can take the extra load | Electrician, with a load assessment |
| Consumer unit | Space and suitable protection for a new circuit, or an upgrade | Electrician |
| Dedicated circuit | Its own circuit from the consumer unit, sized for the charger | Electrician |
| RCD protection | Its own residual current protection that also covers DC fault currents | Electrician, to BS 7671 |
| Earthing | Protection against a broken supply neutral (open PEN) on most homes | Electrician |
| Smart charger | Meets the Electric Vehicles (Smart Charge Points) Regulations 2021 | Charger manufacturer and installer |
| Network notification | The local electricity network operator is told about the charger | Installer |
| Building Regulations | A new circuit is notifiable electrical work | Installer or building control |
| Planning permission | Usually not needed at a house, but check listed buildings and conservation areas | You, with the council if unsure |
| Permission for flats | Freeholder or landlord consent for the parking space and cable route | You |
Parking and where the charger goes
A home charger needs a private, off-street parking space: a driveway, a garage, or an allocated space you own or have the right to use. The charger is usually mounted on the house or garage wall close to where the car’s charging port sits when parked, so the cable reaches without stretching.
Trailing a charging cable across a public pavement creates a trip hazard. If you only have on-street parking, speak to your council about local on-street charging instead.
Think about the cable route from the consumer unit to the charger, too. The shorter and simpler it is, the less disruption. The charger location also needs a reasonable Wi-Fi or mobile signal, because smart chargers need to connect.
Your electricity supply
A typical home charger adds a large, long-lasting load to your supply. Before fitting one, an electrician works out your home’s maximum demand, taking into account cookers, electric showers, heating and anything else that can run at the same time.
If there is not enough spare capacity, there are usually options:
- Load management. Many chargers can reduce their charging rate automatically when the house is using a lot of power.
- A supply upgrade. The network operator may need to fit a larger main fuse or upgrade the service cable.
- Unlooping. Some older homes share a supply cable with a neighbour (a looped supply). The network operator normally needs to separate it before a charger can be connected.
The consumer unit itself may also need upgrading or replacing if there is no space for a new circuit or the existing protection is not suitable. If your wiring is old, an EICR electrical safety certificate is a sensible first step so any problems are found before the charger goes in.
Electrical safety: circuit, RCD and earthing
EV charging installations have their own section in the wiring regulations (BS 7671 Section 722), backed by the IET Code of Practice for Electric Vehicle Charging Equipment Installation. In practice that means:
- A dedicated circuit from the consumer unit, used only for the charger.
- Residual current protection for the charge point that also protects against DC fault currents. Many chargers have DC fault detection built in, which works with a suitable RCD in the consumer unit.
- Protection against an open PEN fault. Most UK homes have a PME earthing arrangement. If the supply neutral were to break, the car body could become live. Chargers either include an open PEN detection device that disconnects the car, or the installer fits a separate earth rod.
- Suitable cable and containment for the route, protected where it runs outside.
- Testing and certification when the job is finished.
This is not a DIY job. Our EV charging team handles the survey, installation and certification together.
Smart charger rules
Since 30 June 2022, every charge point sold for use at a home or workplace in Great Britain must meet the Electric Vehicles (Smart Charge Points) Regulations 2021. A compliant charger must:
- Be able to connect to the internet and adjust when and how fast it charges.
- Come with default charging hours set outside peak times, which the regulations define as 8am to 11am and 4pm to 10pm on weekdays. You can change or remove these settings.
- Apply a randomised delay of up to 10 minutes at the start of each charge, to avoid everyone’s cars starting at the same moment.
- Keep charging if the internet connection drops, and keep its smart functions if you change energy supplier.
- Meet security requirements for its software and communications.
Plugging into a normal three-pin socket with the cable that came with the car is possible for occasional use, but it is slow and not designed for regular overnight charging.
Notifying the network operator
The installer must tell your local electricity network operator about a new EV charger. Applications are made through the Energy Networks Association’s online process. For many installations this is a simple notification, but where the supply is already heavily loaded the installer must apply and get confirmation before connecting. The network operator aims to confirm whether the charger can connect within 10 working days, and it may need to upgrade the supply first.
Building Regulations
Adding a new circuit for a charger is notifiable electrical work under Part P of the Building Regulations in England. It is either self-certified by an electrician registered with a competent person scheme or notified to building control. You should receive an Electrical Installation Certificate and confirmation that the work has been notified.
New homes with parking have their own rules. Since 2022, Part S of the Building Regulations requires most new homes with associated parking to be built with a charge point.
Planning permission
For most houses, a wall-mounted charger is permitted development and does not need planning permission, provided the outlet and its casing are no larger than 0.2 cubic metres. It does not apply within the curtilage of a listed building or on a scheduled monument. Freestanding upstand chargers have height limits and a limit of one per parking space. If you are in a conservation area or an area with an Article 4 direction, check with your council first.
Grants for home chargers
The government’s EV chargepoint grant for households is aimed at people who own a flat or who rent. Homeowners living in a house are not eligible. You need a private, off-street parking space and an eligible electric vehicle, and the installation must be done by an installer authorised for the scheme. Check the current rules on gov.uk before you book.
Do not do this yourself
- Do not fit a charger, extend a circuit or run an extension lead to a car. Extension leads and adaptors are not designed for the long, heavy load of EV charging and can overheat.
- Do not remove the cover of your consumer unit or meter. The main fuse and meter belong to the network operator and your supplier.
- If you notice scorching, a burning smell or a tripping circuit, stop charging and call an electrician.
How we price it
Charger installations are quoted before any work starts, once we have checked your supply, earthing and the cable route, so you know the price up front. Every rate for our other electrical work is published on our prices page. Our work comes with a 12 month labour guarantee.
Frequently asked questions
Can a normal electrician install an EV charger?
A qualified electrician can, provided they work to BS 7671 Section 722 and the IET Code of Practice, understand the earthing requirements and notify the work correctly. For the household grant, the installer must also be authorised for the scheme. Our guide on how to choose an electrician explains what to check.
Do I need permission to install an EV charger at home?
Most houses do not need planning permission for a wall-mounted charger. Listed buildings, scheduled monuments and some conservation areas are exceptions. In a flat or rented home you also need consent from the freeholder or landlord.
Do I need to tell my electricity network operator?
Yes. The installer must notify the network operator, and where your supply is already heavily loaded they must apply and wait for approval before connecting the charger.
Does my home need a supply upgrade for an EV charger?
Not always. An electrician does a load assessment first. Many homes have enough capacity, especially with a charger that manages its own load. Where there is not, the network operator may upgrade the main fuse or cable, or separate a looped supply.
Can I charge an electric car from a normal socket?
You can for occasional top-ups using the manufacturer’s cable, but it is slow and not intended for regular overnight charging. Never use an extension lead.
Help in Hertfordshire, Bedfordshire and Cambridgeshire
If you are planning a home charger, we can check your supply and earthing, advise on the best position and handle the installation and paperwork. See our EV charging page or call 01462 506374.
What our customers say
Speak to a local engineer
Vantage Plumbing and Heating covers Hertfordshire, Bedfordshire and the surrounding areas. Call and talk to an engineer, or send us the details and we will come back to you with a price.
Gas Safe registered, number 956889. Emergency line answered 24/7.