How to Plan a Bathroom Renovation: A Step-by-Step Guide
Hertfordshire, Bedfordshire & Cambridgeshire
To plan a bathroom renovation, decide what the room needs to do for the people who use it, set a budget with a contingency, then fix the layout around the soil pipe and your water system before you choose a single tile. After that, sort out ventilation and electrics, pick fixtures that suit your water pressure, get a detailed fixed quote, and agree the order of work so you know how long you will be without a bathroom.
In short
- Start with how the room is used, not with how it looks.
- The toilet position is tied to the soil pipe. Moving it is possible but adds the most work.
- Your water system (combi, gravity-fed or unvented) decides which showers will work well.
- Electrical work near a bath or shower is notifiable under Part P, and any existing extractor must be kept or replaced.
- A good quote lists every item and stage. A vague quote leads to extras.

Step 1: decide what the bathroom has to do
Write down what is wrong with the room now and who will use it for the next ten years. The answers shape everything else, and they are the first things our bathroom renovation team asks at a survey.
- Is it the main family bathroom, an en suite or a cloakroom?
- Do you want a bath, a shower, or both? Families with young children usually want a bath.
- Does anyone need easier access now or in future, such as a level-access shower or grab rails? It is far easier to plan for that now than to adapt the room later.
- What annoys you most: storage, cold, damp, poor showers, or a cramped layout?
Look at real finished rooms for ideas. Our bathroom gallery shows rooms we have built, with the details that make them work.
Step 2: set your budget and your priorities
Decide a total you are comfortable with and keep a contingency on top for surprises. Once the old bathroom is stripped out, rotten floorboards, old pipework or poor walls are common, especially in older homes.
Then decide where the money matters most to you. A good shower valve and properly waterproofed walls matter far more over time than an expensive basin. Our bathroom renovation cost guide explains what drives the price up and down.
Step 3: measure and plan the layout
Draw the room to scale with the positions of the door, window, radiator, soil pipe and any boxing. Then plan around the fixed points.
- The soil pipe decides the toilet. A toilet needs a large waste pipe with the right fall to the soil stack. Keeping it close to the current position saves the most work. A macerator can help in awkward spots but is a compromise.
- Waste falls matter for baths and showers too. A shower tray or wet room floor needs enough fall to its waste. Our wet rooms page explains what a fully level floor involves.
- Leave space to use each fitting. Allow clear space in front of the toilet and basin and room to step out of the shower or bath. Check the door can open fully.
- Think about where the radiator or towel rail goes and whether underfloor heating would free up wall space.
If you are keeping the layout, the job is simpler, quicker and usually lower cost. If you are changing it, plan the pipe runs first.
Step 4: check your water system before choosing a shower
The shower you choose must suit your hot water system. This is one of the most common planning mistakes.
| Your system | Suits | Watch out for |
|---|---|---|
| Combi boiler | Thermostatic mixer showers on mains pressure | Flow drops if two showers run at once |
| Unvented cylinder | Mixer showers and rainfall heads with strong flow | The cylinder must be big enough for the household |
| Gravity-fed (tank in the loft) | Mixer showers with a suitable pump, or an electric shower | Mains-pressure fittings will be weak without a pump |
| Electric shower | Rooms where the hot water supply is limited | Needs a dedicated circuit of the right size |
If your current shower is weak, fix the cause at the planning stage rather than after the tiles are up.
Step 5: ventilation, electrics and the regulations
Bathrooms are wet, and the regulations reflect that.
- Ventilation. Under the Building Regulations guidance on ventilation, if you refurbish a bathroom any existing extract ventilation must be kept or replaced. A new bathroom needs extract ventilation. A good extractor is the best defence against mould.
- Electrics. Under Part P, electrical work in a bathroom is notifiable when it adds to or alters circuits in the special location around the bath or shower, or adds a new circuit, for example for an electric shower. Use a registered electrician who can self-certify, or notify building control.
- Hot water. Thermostatic valves protect against scalding. They are the sensible choice for any family bathroom.
Before anything is ripped out
- Textured ceilings, old floor tiles and some older boxing materials can contain asbestos in homes built before 2000. If you are unsure, have it tested before work starts.
- Do not notch or cut floor joists to run pipes without knowing the limits. Badly cut joists weaken the floor.
- Turn off the water and isolate the electrics before removing fittings. Never leave live cables exposed in a wet room.
- Moving a gas boiler or gas pipework as part of the project is work for a Gas Safe registered engineer only.
Step 6: choose the fixtures and finishes
With the layout and water system settled, choose the fittings.
- Bath or shower: standard, freestanding or shower bath; enclosure, walk-in screen or wet room.
- Toilet and basin: wall-hung pieces make the floor easy to clean but need a frame and boxing. Close-coupled and back-to-wall suit most rooms.
- Storage: vanity units and mirrored cabinets keep surfaces clear.
- Walls and floors: tiles, wall panels or a mix. Waterproof (tank) behind tiles in any shower area.
- Heating: a towel radiator, underfloor heating, or both.
- Lighting: bathroom-rated fittings in the right zones.
Order long-lead items early. Waiting for a special shower tray or vanity unit is one of the most common reasons a job stalls.
Step 7: get a proper quote
A detailed quote protects you. It should list the strip-out, the plumbing, electrics, boarding and waterproofing, tiling, fittings, waste removal and making good, and say who supplies what. Our guide to what a bathroom installation quote should include gives a full checklist, and our guide on how to choose a bathroom installer in Hertfordshire covers the questions to ask.
Step 8: understand the order of work
Every bathroom follows roughly the same sequence. Knowing it helps you plan around being without a bathroom.
- Strip out the old suite, tiles and flooring, and check the floor and walls.
- First fix plumbing and electrics: new pipes, wastes, shower valve, cables and extractor ducting, before the walls are closed.
- Boarding and waterproofing: cement or waterproof boards, tanking in wet areas, and levelling the floor.
- Tiling or panelling of walls and floor.
- Second fix: fitting the toilet, basin, bath or tray, shower, taps, towel rail, lights and extractor.
- Sealing and finishing: silicone, boxing, decorating.
- Testing and handover: checking for leaks, testing the shower and electrics, and showing you how everything works.
A straightforward like-for-like refit is faster than a full redesign, and a wet room or a layout change takes longer. Ask your installer for a written schedule.
What to avoid
- Choosing a shower before checking your water system.
- Skipping waterproofing behind tiles in the shower area.
- Losing the extractor, or fitting one that is too weak or too noisy to use.
- Leaving no contingency.
- Changing the design halfway through the build.
How we price it
Installations are quoted as a fixed price after a free survey, so the price you agree is the price you pay. Our bathroom team handles the plumbing, tiling and finishing, and every bathroom we install carries a 2 year guarantee. For smaller repair work, every rate is published on our prices page.
Frequently asked questions
How long does it take to plan a bathroom renovation?
Allow a few weeks to decide on the layout, choose fittings and get quotes, and longer if you are changing the layout or ordering items with long lead times. Planning properly before work starts is what keeps the build itself on schedule.
Do I need building regulations approval for a new bathroom?
A like-for-like refit usually does not need a building regulations application, but some parts are covered by the regulations. Electrical work around the bath or shower is notifiable, and new drainage or structural changes may need approval. Your installer should tell you what applies.
Can I move the toilet to a different wall?
Often, yes, but the toilet must connect to the soil pipe with enough fall. Moving it a short distance is usually straightforward. Moving it far from the stack may mean lifting floors or using a macerator.
Should I choose a bath or a shower?
If it is the only bathroom in a family home, keeping a bath is usually wise. In an en suite or a home where no one uses the bath, a large walk-in shower can make better use of the space.
What should I buy myself and what should the installer supply?
Many people choose the suite and tiles themselves, and let the installer supply the valves, wastes, boards and fixings. Agree this in writing, so you know who is responsible if a part is wrong or late.
Bathroom renovations across Hertfordshire, Bedfordshire and Cambridgeshire
If you are planning a new bathroom and want an honest view on layout, water pressure and what it will involve, our team will survey the room and give you a fixed price. See our bathroom renovation page or call 01462 506374.
What our customers say
Speak to a local engineer
Vantage Plumbing and Heating covers Hertfordshire, Bedfordshire and the surrounding areas. Call and talk to an engineer, or send us the details and we will come back to you with a price.
Gas Safe registered, number 956889. Emergency line answered 24/7.
Bathroom fitters near you
Planning a new bathroom? Our own team designs and fits it
We cover Hertfordshire, Bedfordshire and Cambridgeshire. Choose your town:
Not listed? See all the areas we cover or call 01462 506 374